JGL Corporate brochure - Flipbook - Page 37
In addition, twelve 1500mm TBM drives will be
delivered, spanning lengths of 55 metres up to 260
metres. The project also incorporates a 20-inch
Horizontal Directional Drilling (HDD) crossing and
a significant 36-inch, direct pipe crossing beneath
the River Dee. This will be the first installation of a
production pipeline by direct pipe technology in the UK.
Further installations will comprise two 20-inch
auger crossings and thirty-seven 36-inch crossings,
ensuring seamless and safe passage beneath existing
infrastructure and natural features.
Positive impact
This project not only showcases JGL’s market-leading
variety of trenchless technology capabilities but also
plays a vital role in:
»
Supporting the North West’s shift towards a clean
hydrogen economy.
»
Reducing regional carbon emissions at scale.
»
Protecting critical infrastructure through advanced
trenchless installation methods.
»
Creating approximately 160 local roles within JGL’s
scope of delivery, accounting for over half of the 300
supply chain jobs projected for the project overall.
»
Enabling inward investment into industrial
decarbonisation.
This project will significantly decarbonise the North
West of England and North Wales, driving inward
investment, creating jobs, and contributing to the UK’s
net zero targets.
Joseph Gallagher Group | CORPORATE PORTFOLIO | 2026