Case studies: HS2, London Tunnels Project
HS2 WORKS, LONDON
TUNNELS PROJECT,
LONDON
Sector Rail infrastructure
Client Skanska, Costain, Strabag (JV) with HS2 as end-user / client
Location West Ruislip to Euston
Scope of works
We have assisted with supplying specialist labour
for the construction of:
* Canterbury Road vent shaft
* Westgate vent shaft
* Green Park Way vent shaft
* West Ruislip to Green Park Way
* Twin bore TBM drive (NTW)
Our technical specialists to assist the SCS JV
included:
* Pit bosses
* TBM operators
* Leading miners
* Erector operators
* Miner / ring builders
* Mechanical and electrical supervisors
* TBM and conveyor fitters
Specialist TBM and shaft workforce
* Welder / fabricators
We are a business that can provide skilled
tunnelling labour. Additionally, we have a strong
core of long-term employees that we can move
across from existing contracted works ensuring
any unplanned labour requirements were met.
Our reserve crews and multi-skilled operatives
ensured SCS could adapt quickly to changing
production rates or mechanical downtime.
* TBM support crews
* Logistics foreman
* MSV/ PSV operators
* Full spectrum of multi-skilled plant operators
* SCL cross passage teams (Nozzleman / Face
Drivers / Pump ops), engineering teams
38
The HS2 London Tunnels programme includes a
8km twin bore TBM tunnel drive from West Ruislip
to Green Park, forming the western approach
tunnels into central London.
The Twin bore tunnel crosses numerous deep
ventilation shafts with numerous cross passage
that demand complex planning, logistics, and
continuous 24/7 tunnelling operations.
We delivered a team of specialist labour for TBM
operations running continuously across the full
tunnelling cycle. JGL provided and managed up to
700 operatives, 24/7/365, across the sites with 560
working at the West Ruislip TBM drive site alone.
JGL supported all shaft activities including
platform management, logistics, operations, and
tunnelling support crews, maintaining a strong
safety performance, in line with HS2 standards.
A flexible and collaborative workforce solution
was delivered to the SCS, ensuring the JV had
the required skills onsite during peak tunnelling
phases.